Desa CDV37N/P, CDV41N/P Horizontal Termination Configurations, Horizontal Venting

Models: CDV37N/P CDV41N/P

1 36
Download 36 pages 42.5 Kb
Page 10
Image 10

CDV37N/P(A,B) AND CDV41N/P(A,B)

DIRECT-VENT FIREPLACE (NATURAL/PROPANE/LP)

VENTING INSTALLATION

Continued

Horizontal Termination

Configurations

Figures 16 through 20 show different con- figurations for venting with horizontal ter- mination. Each figure includes a chart with vertical minimum/maximum and horizon- tal maximum dimensions which must be met. Seal all connections with high tem- perature silicone sealant (outer pipe only) as specified in the second warning statement on page 7. All horizontal terminations re- quire 1/4" rise per 12" of horizontal run.

Horizontal Venting

Vertical (V)

Horizontal (H)

44" min.

29" max.

(30° and 90° only, no vertical pipe)

55" min.

41" max.

(30° elbow, 1' vertical pipe, 90° elbow)

67" min.

60" max.

79" min.

84" max.

96" min.

20' max.

Note: This configuration for use with corner installation.

UP

CBVK Vent Kit Shown

UP

CGFVK Vent Kit Shown (recommended for use with cabinet mantels)

Horizontal Venting

Vertical (V)

Horizontal (H)

37" min.

17" max.

Figure 16 - Horizontal Termination Configuration for Rigid Venting

Figure 17 - Horizontal Termination Configuration for Rigid Venting Using One 90° Elbow

Horizontal Venting

See information in

Figure 17 for

UP Vertical(V) and

Horizontal(H) maxi- mums and minimums. The same amounts apply for flexible venting.

Note: Figure 16 applies to rigid venting only.

Figure 18 - Horizontal Termination Using Flexible Venting

10

105541

Page 10
Image 10
Desa CDV37N/P, CDV41N/P installation manual Horizontal Termination Configurations, Horizontal Venting