INSTALLATION

Gas Line Hook-Up (Cont.)

Ember and Pan Material Placement

INSTALLATION

Continued

DESA recommends that a black iron gas line be routed from the gas source, through a sediment trap (shown in Figure 18), and into the appliance, Once connected through the appliance, a flexible gas line may be used for ease of installation to gas control valve (see Figure19).

Before connecting the black iron gas line to the inside of the appliance a sediment trap must be included outside the appliance between the gas line and the gas shutoff valve. It must extend down three (3) inches beyond the center of the pipe. Prepare incoming black iron gas line with teflon tape or pipe joint compound (Check with local building codes).

EMBER AND PAN MATERIAL PLACEMENT CAUTION: Compounds used on threaded joints of gas piping shall be resistant to the action of Liquefied Petroleum (LP or propane), and should be applied lightly to ensure excess sealant does not enter the gas line.

Manual background WARNING: All gas piping and connections must be tested for leaks after the installation is completed.

After ensuring that the gas valve is on, apply a commer- cial leak detection solution to all connections and joints. If bubbles appear, leaks can be detected and corrected.

Do not use an open flame for leak testing and do not operate any appliance if a leak is detected.

Complete your gas installation by connecting incoming gas line with flexible gas line. Secure tightly with wrench but DO NOT

OVERTIGHTEN.

Incoming 1/2" Gas Line

Permitted by Local Codes

Sediment Trap

(Not Supplied)

 

Wall

Side

3" Min.

 

Appliance

(76mm)

Of

 

EMBER AND PAN MATERIAL PLACEMENT

1.Open the bag(s) of vermiculite and fill the entire burner pan until the burner tube is completely covered (see Figure 20).

2.Smooth the pan material just even with edges of the burner pan.

3.Remove the ember material from the bag and flatten small amounts into quarter size pieces and lay on top of the surface of the pan material (see Figure 21).

4.Place just enough to cover the entire surface and leave about a 1/2 inch gap under the lower grate members to allow air to flow (see Figure 22).

Grate

Vermiculite

Burner Pan

(Pan Material)

 

 

 

Figure 20 - Fill Entire Burner Pan with Vermiculite

 

Ember

Vermiculite

 

Grate

Material

Burner Pan

(Pan Material)

 

 

 

Figure 18 - Sediment Trap

Figure 21 - Ember Material on Surface of Pan Material

(Vermiculite)

 

Pan and Ember

 

 

 

Grate

 

 

 

 

 

Material

 

Red Surface Indicates

 

 

 

 

 

 

 

 

 

 

0.5"

 

Equipment

For Propane/LP Use Only

 

 

 

 

 

 

 

 

 

Flexible Gas Line

 

 

 

 

 

 

 

Shutoff Valve

Do NOT Kink

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

1/2" NPT Incoming

 

 

0.5"

 

 

 

Gas Line

Inlet Pressure Tap

Outlet Pressure Tap

Burner Pan

 

 

Note:

 

 

 

 

 

1)

Wire Connections Not Shown for Clarity

 

 

2)

* 1/8" NPT Plugged Tapping

 

Figure 22 - Pan and Ember Material Clearances

Figure 19 - Connecting Flexible Gas Line to Electronic Valve

Manual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundFor moreManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundvisit www.Manual backgroundManual backgroundManual background.comManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual background

108796-01D

Page 12
Image 12
Desa H) AND VM42E(B, M36E, M42E, VM36E, VM42E Ember And Pan Material Placement, Installation, Continued, Overtighten

FAQ

What materials are recommended for gas line hook-up?

DESA recommends using a black iron gas line and a flexible gas line for ease of installation.

How should the gas line be prepared before connecting to the appliance?

The incoming black iron gas line should be prepared with teflon tape or pipe joint compound, following local building codes.

How should the ember and pan material be placed?

The burner pan should be filled with vermiculite and the ember material should be laid on top, leaving a gap for air flow.