Pump Rotor

(Procedure if rotor is binding)

1.Remove upper shell (see page 9).

2.Remove filter end cover screws using 5/16" nut-driver.

3.Remove filter end cover and air filters.

4.Remove pump plate screws using 5/16" nut-driver.

5.Remove pump plate.

6.Remove rotor, insert, and blades.

7.Check for debris in pump. If debris is found, blow out with compressed air.

8.Install insert and rotor.

9.Check gap on rotor. Adjust to

.003"/.004" if needed (see Figure 17).

Note: Rotate rotor one full turn to insure the gap is .003"/.004" at tightest position. Adjust if needed.

10.Install blades, pump plate, air filters, and filter end cover.

11.Replace fan guard and upper shell.

12.Adjust pump pressure (see page 10).

Note: If rotor is still binding, pro- ceed as follows.

13.Perform steps 1 through 6 (see above).

14.Place fine grade sandpaper (600 grit) on flat surface. Sand rotor lightly in “figure 8” mo- tion four times (see Figure 18).

15.Reinstall insert and rotor.

16.Perform steps 10 through 12 above.

WIRING

DIAGRAM

Blade

Pump Plate

Air Intake Filter

Filter End Cover

Insert

Rotor

Air Output Filter

50 ROTOR

PFA/P 056

Fan Guard

Figure 16 - Rotor Location

Gap Adjusting Screw

.003"/.004" Gap

Measured With

Feeler Gauge

Blade

Rotor

Gap Adjusting Screw

Figure 17 - Gap Adjusting Screw Locations

Sandpaper

 

 

Figure 18 - Sanding Rotor

 

 

 

 

 

 

Power Plug

 

 

 

 

 

 

120V/60Hz

 

 

 

 

 

 

White

 

Black

 

 

 

 

 

 

Green

 

 

 

 

White

 

 

White

B

 

 

 

 

 

 

 

 

 

 

White

 

 

 

Flame-

 

Green

 

Green/

Terminal

White

Blue Blue

 

Ignitor

Out

 

Motor

Yellow

Board

 

 

Control

Reset

 

 

 

Photocell

 

 

Spark Plug

 

 

 

Button

 

 

 

 

 

R

 

 

 

 

 

 

 

 

Red

 

Red

 

 

 

 

 

 

 

 

 

 

Red

 

 

 

 

 

Figure 19 - Wiring Diagram

11

 

 

102437

Page 11
Image 11
Desa PORTABLE FORCED AIR HEATERS owner manual Wiring Diagram, Pump Rotor