(Pump Rotor, continued)

10.Install blades, pump plate, air filters, and filter end cover.

11.Replace fan guard and upper shell.

12.Adjust pump pressure (see page 11).

Note: If rotor is still binding, pro- ceed as follows.

13.Perform steps 1 through 6 (see page 12).

14.Place fine grade sandpaper (600 grit) on flat surface. Sand rotor lightly in “figure 8” mo- tion four times (see Figure 18).

15.Reinstall insert and rotor.

16.Perform steps 10 through 12 above.

SPECIFICATIONS

WIRING

DIAGRAM

TECHNICAL

SERVICE

12

Gap Adjusting Screw

 

.003"/.004" Gap

Sandpaper

Measured With

 

Feeler Gauge

 

Blade

 

Rotor

 

Gap Adjusting Screw

Figure 18 - Sanding Rotor

 

Figure 17 - Gap Adjusting Screw Locations

 

Output Rating (Btu/Hr.)

50,000

Fuel

Use Only Kerosene

 

or No. 1 Fuel Oil

Fuel Tank Capacity (U.S. Gal.)

4.0

Fuel Consumption (Gal. Per Hr.)

.40

Electric Requirements

120 V/60 Hz

Amperage (Normal Run)

2.0

Motor RPM

1725

Hot Air Output (CFM)

175

Air Pump Pressure (PSI)

3.4

Shipping Weight (Approximate Pounds)

35

Heater Weight Without Fuel (Approximate Pounds)

30

Power Plug 120V 60HZ

 

 

 

White

 

Black

 

 

 

 

 

 

 

 

Green

 

 

 

 

 

White

 

 

White

B

 

 

 

 

 

 

 

 

 

 

Green

White

 

 

 

 

Flame

 

 

 

Terminal

White

Blue

Blue

 

 

Spark Plug

Out

Reset

Motor

Ignitor

 

Board

 

 

 

Control

Button

 

 

 

 

Photocell

 

 

Red

 

 

 

 

 

 

 

Red

 

R

 

 

 

 

 

 

 

 

 

 

 

Red

 

 

 

 

 

 

Figure 19 - Wiring Diagram

You may have further questions about operation or troubleshooting. If so, contact DESA International's Technical Service Dept. at 1-800-323-5190.

102016

Page 12
Image 12
Desa REM50B, B50G owner manual Specifications Wiring Diagram Technical Service