Desa manual Installing Blower Before Mounting Fireplace, MODELS VCBK4R &VCBK4L FAN KIT

Models: VCBK4L VCBK4R

1 2
Download 2 pages 17.63 Kb
Page 1
Image 1
MODELS: VCBK4R &VCBK4L FAN KIT

MODELS: VCBK4R &VCBK4L FAN KIT

INSTALLATION AND OPERATING INSTRUCTIONS

INSTALLING BLOWER BEFORE MOUNTING FIREPLACE

Note: Fireplace must be properly connected to a 110V power source before blower can be operated.

1.Remove large knockout tab (see Figure 1).

2.Align two holes on side of rectangular bracket with two holes on side frame. Secure with screws provided (see Figure 7).

3.Place blower assembly in fireplace and plug male electrical connector into female connector already in fireplace. Make sure

rocker switch wire protrudes through notch in fireplace side (see Figure 2). Connect wires with rocker switch.

4.Take four sheet metal screws provided and secure blower as- sembly to fireplace through holes (see Figure 3). Blower should now be in place and look similar to Figure 4.

Note See instructions on reverse side if FULL VIEW glass doors are installed.

Fireplace

Fireplace

Blower

 

 

Assembly

INSTALLATION AND OPERATING INSTRUCTIONS Knockout Tab

INSTALLING BLOWER BEFORE MOUNTING FIREPLACE Electrical Connection

 

Rocker Switch

Male Electrical

 

and Wiring

 

Connector

 

 

Figure 1

 

Figure 2

 

Blower

 

 

Assembly

 

Sheet Metal

Screws

Rectangular

Bracket

ON/OFF Switch Manual background

Fireplace Face

Figure 3

Figure 4

Page 1
Image 1
Desa manual Installing Blower Before Mounting Fireplace, MODELS VCBK4R &VCBK4L FAN KIT