14

VENTING INSTALLATION INSTRUCTIONS

Installation for Vertical Termination (Cont.)

VENTING INSTALLATION INSTRUCTIONS

Continued

Vertical Termination Configurations

Figures 21 through 24 show four different configurations for verti- cal termination.

Venting with Two 90° Elbows

Vertical (V) Horizontal (H1) +

Horizontal (H2)

Venting with One 90° Elbow

Vertical (V)

Horizontal (H)

5' min.

2' max.

6' min.

4' max.

7' min.

6' max.

8' min.

8' max.

20' max.

8' max.

45° Elbow

Note: Install restrictor

 

5' min. 6' min. 7' min. 8' min. 20' max.

45° Elbow

2' max. 4' max. 6' max.

8' max. Note: Install restrictor into

8' max. inner collar of fireplace as shown.

into inner collar of

fireplace as shown.

Figure 22 - Vertical Venting Configuration Using One 90° Elbow

(Vertical Round High Wind Termination Shown)

Venting with Two 90°

Elbows

Vertical (V1)

Horizontal (H)

5' min.

 

6' max.

6' min.

 

12' max.

7' min.

 

18' max.

8' min.

 

20' max.

Figure 21 - Vertical Venting Configuration Using Two 90° Elbows

 

 

with Two Horizontal Runs (Vertical Round High Wind Termination

 

 

Shown)

 

 

Note: Install restrictor

into inner collar of

 

fireplace as shown.

45° Elbow

 

 

Note: Vertical (V1) + Vertical (V2) = 40' max.

Figure 23 - Vertical Venting Configuration Using Two 90° Elbows

(Vertical Round High Wind Termination Shown)

For..com

111921-01A

Page 14
Image 14
Desa (V)K42N installation manual Vertical Termination Configurations, Venting with One 90 Elbow, Elbows