Desa VP5B Installing To Wall, Continued, Ceiling, Combustible Material FLOOR, Screw, Minimum To

Models: VP5B VP11A

1 28
Download 28 pages 59.56 Kb
Page 10
Image 10
CEILING

10

INSTALLING TO WALL

Continued

For convenience and efficiency, install heater

where there is easy access for operation, inspection, and service

in coldest part of room

CEILING

36"

Minimum

Minimum 8" Minimum

From 3" Minimum To Top SurfaceCombustible MaterialFigure 4 - Mounting Clearances As Viewed From Front of Heater Sides Of

Heater

Right

LeftSide

Side

3" Minimum To Top Surface

Of Carpeting, Tile Or Other

Combustible Material

FLOOR

Figure 4 - Mounting Clearances As Viewed From Front of Heater

INSTALLING HEATER TO WALL

Marking Screw Locations

1. Determine where you will locate heater.

Screw WARNING

Maintain minimum clearances shown in Figure 5. If you can, provide greater clearances from floor and joining wall.

2. Mark two mounting screw locations on wall (see Figure 5).

Minimum To 10 7/8"JOININGClearance 7 3/4"Figure 5 - Mounting Screw Locations

Minimum To

Maintain 8"

Clearance

From Wall

WALL

Mounting

20 1/4"

 

Screw
Minimum To
JOINING

Locations

Maintain 3"

 

Clearance

 

 

 

 

From Floor

FLOOR

Figure 5 - Mounting Screw Locations

100844

Page 10
Image 10
Desa VP5B, VP11A Installing To Wall, Continued, Ceiling, Minimum 8 Minimum From Sides Of Heater Right LeftSide Side, Screw