Desa (V)T36EPA SERIES, (V)T36ENA SERIES Venting Installation Instructions, Continued

Models: (V)T36ENA SERIES, (V)T36EPA SERIES (V)T36EPA SERIES, (V)T36ENA SERIES

1 38
Download 38 pages 46.18 Kb
Page 12
Image 12
Venting with Two 90° Elbows

12

VENTING INSTALLATION INSTRUCTIONS

Installation Planning (Cont.)

VENTING INSTALLATION

INSTRUCTIONS

Continued

HORIZONTAL SYSTEM INSTALLATION USING TWO 90°

ELBOWS

The following configurations show the minimum vertical rise requirements for a horizontal system using two 90° elbows.

Venting with Two 90° Elbows

Vertical (V)

Horizontal (H1)

Horizontal (H1) +

Horizontal (H2)

5' min.

2' max.

45° Elbow

6' max.

6' min.

4' max.

12' max.

7' min.

6' max.

18' max.

8' min.

8' max.

20' max.

20' max.

8' max.

20' max.

Figure 17 - Horizontal Termination Configuration for Venting Using Two 90° Elbows

Venting with Two 90° Elbows

 

Horizontal (H1) +

Vertical (V)

Horizontal (H2)

5' min.

6' max.

6' min.

12' max.

7' min.

18' max.

8' min.

20' max.

20' max.

20' max.

45° Elbow

Figure 18 - Horizontal Termination Configuration for Venting Using Two 90° Elbows with Termination at 90° with Fireplace

Manual backgroundManual backgroundManual backgroundManual backgroundManual backgroundForManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual background.Manual backgroundManual backgroundManual backgroundManual background.comManual backgroundManual backgroundManual backgroundManual backgroundManual background

111251-01D

Page 12
Image 12
Desa (V)T36EPA SERIES, (V)T36ENA SERIES Venting Installation Instructions, Continued, Venting with Two 90 Elbows