Desa (V)VC42N Horizontal System Installation Using TWO Elbows, Venting with Two 90 Elbows

Models: (V)VC42N

1 40
Download 40 pages 10.67 Kb
Page 12
Image 12

12

VENTING INSTALLATION INSTRUCTIONS

Installation Planning (Cont.)

VENTING INSTALLATION

INSTRUCTIONS

Continued

HORIZONTAL SYSTEM INSTALLATION USING TWO 90°

ELBOWS

The following configurations show the minimum vertical rise re- quirements for a horizontal system using two 90° elbows.

Venting with Two 90° Elbows

Vertical (V)

Horizontal (H1)

Horizontal (H1) +

 

 

 

Horizontal (H2)

45° Elbow

5' min.

2' max.

6' max.

 

6' min.

4' max.

12' max.

 

7' min.

6' max.

18' max.

 

8' min.

8' max.

20' max.

 

20' max.

8' max.

20' max.

 

Figure 17 - Horizontal Termination Configuration for Venting Using Two 90° Elbows

Venting with Two 90° Elbows

Vertical (V)

Horizontal (H1) +

 

Horizontal (H2)

5' min.

6' max.

6' min.

12' max.

7' min.

18' max.

8' min.

20' max.

20' max.

20' max.

45° Elbow

Figure 18 - Horizontal Termination Configuration for Venting Using Two 90° Elbows with Termination at 90° with Fireplace

www.desatech.com

116236-01D

Page 12
Image 12
Desa (V)VC42N installation manual Horizontal System Installation Using TWO Elbows, Venting with Two 90 Elbows