Clearances
Framing and Finishing
5
PRE-INSTALLATION
PREPARATION
Continued
CLEARANCES
Minimum clearances to combustibles for the fireplace are as follows:
For available accessories for this fireplace, see Accessories on page
36.If you are using a separate combustible mantel piece, refer to Figure 6 for proper installation height. You can install noncombus- tible mantels at any height above the fireplace.
Note: Noncombustible mantels may discolor!
*Back and sides | 0"/mm |
Perpendicular walls | 6" (152mm) |
Floor | 0"/mm |
Ceiling to louver opening | 42" (1067mm) |
Front | 36" (914mm) |
Top of Standoffs | 0"/mm |
Vent | (See venting instructions for |
| specific venting clearances.) |
Combustible material with a maximum thickness of 5/8" may be flush with the top front of fireplace.
*For back and sides of fireplace, do not pack with insulation or other materials. Zero inch clearance to combustible materials are for framing purpose only.
21 | 5/8" | 13 1/2" |
41 5/8"
16 3/4"
48" 48 1/4"
81 1/2"
58 1/2"
Nailing Tabs
NOTICE: This fireplace is intended for use as supple- mental heat. Use this fireplace along with your primary heating system. Do not install this fireplace as your primary heat source. If you have a central heating system, you may run system’s circulating blower while using fireplace. This will help circulate the heat throughout the house. In the event of a power outage, you can use this fireplace as a heat source.
FRAMING AND FINISHING
Figure 4 shows typical framing of this fireplace. Figure 5 shows fram- ing for corner installation. All minimum clearances must be met.
40 1/8"
48 1/4"
23" Horizontal Vent
26 1/2" Vertical Vent
Figure 4 - Framing Clearances for Installation Against an Exterior Wall
Figure 5 - Framing Clearances for Corner Installation
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 1 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 2 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 3 |
|
|
|
|
| A |
|
|
|
|
|
|
|
|
|
|
| Wall | ||
|
|
|
|
|
|
|
|
|
|
|
|
| 4 |
| |||
|
|
|
|
|
|
|
|
|
|
|
|
| |||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| ||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| B |
|
|
|
|
|
|
|
| 5 |
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| C |
|
|
|
|
|
| 6 |
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
| D |
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
| E |
|
|
| 7 |
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| F |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |||
|
|
|
|
|
|
|
|
|
|
|
| G |
|
|
| ||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| Top of Louver Opening | ||||||||
|
|
|
|
|
| ||||||||||||
| Ref. Mantel Depth | Ref. Mantel from Top |
|
|
| ||||||||||||
|
|
|
|
|
|
|
|
| of Louver Opening |
|
|
| |||||
|
|
|
|
|
|
|
|
|
|
| |||||||
1 | 14" (356mm) |
| A |
|
| 16" (406mm) |
|
|
| ||||||||
|
|
|
|
|
|
|
|
|
|
| |||||||
2 | 12" (305mm) |
| B |
|
| 14" (356mm) |
|
|
| ||||||||
|
|
|
|
|
|
|
|
|
|
| |||||||
3 | 10" (254mm) |
| C |
|
| 12" (305mm) |
|
|
| ||||||||
|
|
|
|
|
|
|
|
|
|
| |||||||
4 | 8" (203mm) |
| D |
|
| 10" (254mm) |
|
|
| ||||||||
|
|
|
|
|
|
|
|
|
| ||||||||
| 5 | 6" (152mm) |
| E |
|
| 8" (203mm) |
|
|
| |||||||
|
|
|
|
|
|
|
|
|
| ||||||||
| 6 | 4" (101mm) |
| F |
|
| 6" (152mm) |
|
|
| |||||||
| 7 | 2" (51mm) |
| G |
|
| 4" (101mm) |
|
|
|
Figure 6 - Clearances for Combustible Mantels
www.desatech.com |