Installation

Continued

CAUTION: All gas piping

 

Brick Installation

 

 

 

 

 

IMPORTANT:Installationofbrick

and connections must be tested

 

for leaks after the installation

 

should be done after the fire-

is completed. After ensuring

 

place is placed in a permanent

that the gas valve is on, apply

 

location.

 

soap and water solution to all

 

 

 

 

Each brick housing is stamped with a number

connectionsandjoints.Bubbles

 

 

(full size bricks are not stamped). These num-

forming show a leak. Correct

 

 

bers will help identify the brick when installing.

all leaks at once. DO NOT USE

 

It is important to install these bricks exactly as

AN OPEN FLAME FOR LEAK

 

instructed. Press brick firmly into brick housing

TESTING AND DO NOT OPER-

 

until it snaps. Groove line on side of brick will

ATEANYAPPLIANCE IFALEAK

 

come in contact with flange on brick housing.

 

This secures brick into housing (see Figure

IS DETECTED. LEAK TESTING

 

 

24). Smaller bricks may require a small portion

SHOULD BE DONE BYAQUALI-

 

 

of furnace cement applied to back of brick to

FIED SERVICE PERSON.

 

secure it until grouting has been completed.

 

 

Bricks are packaged in separate boxes. Brick

 

 

WARNING: Do not oper-

 

matrixes on pages 12 through 15 show how

 

bricks are packaged and placed for each size

ate an unvented gas log set in

 

 

fireplace and number of bricks per box. There

this fireplace with the chimney

 

 

are 2 extra full bricks included in Hearth Brick

removed.

 

package. Bricks in brick matrixes are labeled

 

 

"I" for ivory and "R" for red.

 

If you install a decorative gas appliance

 

Install bricks one section at a time starting with

(vented gas log), the decorative gas appliance

hearth panel followed by the rear panel, left

must comply with the Standard for Decorative

panel and right panel. It is important to install

Gas Appliance for Installation in Solid Fuel

the bricks in sequence. Please note, full size

Burning Fireplaces, ANS Z21.60, Z21.84 or

bricks are NOT stamped.

 

RG 2-72and shall also be installed in accor-

 

 

 

dance with the National Fuel Gas Code, ANSI

NOTICE:Anashlipkitisavailable

Z223.1/NFPA 54 latest edition.

for this fireplace (See Replace-

WARNING: If fireplace has

 

ment andAccessory Parts, page

 

18).IfusingAshLipKit,standard

been used for wood burning,

 

 

optional glass door kit for this

firebox and chimney must be

 

 

fireplace cannot be installed. If

cleaned of soot, creosote and

 

 

using ash lip, obtain ash lip kit

ashes by a qualified chimney

 

 

prior to brick installation.

cleaner. Creosote will ignite if

 

 

 

 

 

 

 

heavily heated.

 

Brick

Stamped

 

 

 

 

 

 

 

WARNING: When using

 

 

Number

 

 

Location

a decorative vented gas log,

 

Flanges

 

damper must be removed or

 

 

 

 

 

permanently locked in the fully

 

 

 

open position and glass doors

 

 

 

must be in fully open position.

 

 

Brick

 

 

 

 

 

 

Housing

 

 

Figure 19 - Installing Brick

122272-01C

www.desatech.com

11