Installation

Continued

18"

Min.

Typ.

24" Min.

24" Min.

Figure 16 - Multiple Chase Installation

10 foot rule

All flue gas outlet chimney terminations must extend a minimum of 3 feet in height above highest point where it passes through the roof and must be at least 2 feet above highest point of the roof that is within a horizontal distance of 10 feet (see Figure 17).

10'

Level of

 

Flue Gas

 

 

 

 

Outlet

 

 

10'

 

2' Min.

3' Min.

 

 

 

 

2' Min.

3' Min.

 

 

Optional Gas Line

Installation

Gas line hook up should be done by your supplier or a qualified service person.

Note: Before you proceed, make sure your gas supply is turned off. Use only a 1/2" black iron pipe and appropriate fittings.

1.Remove gas line cover plate located on either side of fireplace and pull out insula- tion from gas line conduit sleeve. Save insulation for reuse. Replace screws.

2.Run a 1/2" black iron gas line into fireplace through rear at gas line conduit sleeve (if us- ing a raised platform, add height). Provide sufficient gas line into fireplace chamber for fitting connection (see Figure 18).

Note: Secure incoming gas line to wood framing to provide rigidity for threaded end.

3.Repack insulation around gas line and into sleeve opening. Seal any gaps between gas line and refractory knockout hole with refractory cement or commercial furnace cement, Install the gas appliance or cap-off gas line if desired.

Outside of

 

Side

Fireplace

 

Firebrick

Gas

Incoming

Finished

Side

Line

1/2" Black

 

Conduit

Iron Pipe

 

Figure 17 - 10 Foot Rule

finishing fireplace

Combustible materials, such as wallboard, gypsum board, sheet rock, drywall, plywood, etc. may make direct contact with sides and top around the fireplace face. It is important that combustible materials do not overlap face itself. Brick, glass, tile or other noncombustible materials may overlap front face provided they do not obstruct essential openings like louvered slots or any other opening. When overlapping with a noncombustible facing material, use only noncombustible mortar or adhesive.

Seal

Opening

Repack with

Insulation Refractory Cement

Provide Enough Threaded End for Fitting Connection

Figure 18 - Gas Line Installation