CONTENTS
1 READ IMMEDIATELY | 3 |
1.1Important Information
1.2Legal Provisions and Guidelines
1.3
2 PURPOSE OF HEAT PUMP | 4 |
2.1Application
2.2Principle of Operation
3 SCOPE OF DELIVERY | 4/5 |
3.1Baseline Unit
3.2Control Box
3.3Heat Pump Controller
4 | TRANSPORT | 5 |
5 | INSTALLATION | 6 |
5.1General
5.2Condensate Line
6 MOUNTING | 6/7 |
6.1General
6.2Heating and Hot Water Connection
6.3Electrical Connection
7 | COMMISSIONING | 7/8 |
7.1General
7.2Preparation
7.3Procedure During Heating Period
7.4Procedure During Cooling Period
8 CLEANING / MAINTENANCE 8/9
8.1Maintenance
8.2Cleaning of Heating Side
8.3Cleaning of Air Side
9MALFUNCTIONS, TROUBLE-
SHOOTING | 9 |
10 DECOMMISSIONING | 9 |
10.1Placing Out of Service in Summer
10.2
11 APPENDIX | FF |
2