Dimplex Unvented Water Heater SCx UNVENTED INSTALLATION INSTRUCTIONS, Standard Energy Losses

Models: Unvented Water Heater

1 6
Download 6 pages 38.49 Kb
Page 3
Image 3
STANDARD ENERGY LOSSES

Dimp-15278-SCx_Instructions 31/3/06 9:32 am Page 5

SCx PerformanceWITH AN SCx UNVENTED CYLINDER THE FOLLOWING IS SUPPLIED AS STANDARDSTANDARD ENERGY LOSSES CONNECTING THE WATER SUPPLYCOLD WATER VALVEDRAIN TAPPIPEWORK TO TAPSSECONDARY CIRCULATIONTank SizeExpansion Tank RequiredSCx UNVENTED INSTALLATION INSTRUCTIONSDO NOT ATTEMPT TO VENT THE PRIMARY CIRCUIT THROUGH THE SCx UNIT.SITING THE SCx UNITALL SCx UNITS MUST BE STORED VERTICALLYCHECK WATER PRESSURE & FLOW RATESCold water inlet valve assemblyManual backgroundManual backgroundManual background

The heat loss of each SCx Unvented Unit while maintaining the temperature of the stored water at 65 degrees Celsius. (See performance table below).

1)Tests carried out by BBA. Slight variations may occur with changes to water mains supply pressure

SCx Performance

Nominal

 

Heat up

 

 

 

Heat up

 

 

 

Reheat

 

 

 

Reheat

 

 

 

Heat loss in

 

 

 

 

 

 

 

 

 

Capacity

 

Model IDH

 

 

 

Model DH

 

 

 

Model IDH

 

 

 

Model DH

 

 

 

24 hrs

Litres

 

Mins

 

 

 

Mins

 

 

 

Mins

 

 

 

Mins

 

 

 

kw/hr

80

 

33

 

 

 

64

 

 

 

23

 

 

 

53

 

 

 

1.12

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

130

 

28

 

 

 

115

 

 

 

21

 

 

 

90

 

 

 

1.50

150

 

33

 

 

 

138

 

 

 

24

 

 

 

104

 

 

 

1.82

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

175

 

27

 

 

 

167

 

 

 

24

 

 

 

124

 

 

 

2.10

215

 

35

 

 

 

212

 

 

 

30

 

 

 

153

 

 

 

2.64

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

255

 

42

 

 

 

263

 

 

 

35

 

 

 

184

 

 

 

2.73

305

 

50

 

 

 

313

 

 

 

42

 

 

 

220

 

 

 

2.88

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

2)These figures relate to a 45 degree differential between the stored water and ambient temperature

WITH AN SCx UNVENTED CYLINDER THE FOLLOWING IS SUPPLIED AS STANDARD

1 Element on IDH indirect models up to 305 litres and 80 litre DH direct model

2 Elements on DH direct models from 130 up to 305 litres. Additional elements from 215 to 305 litres are available on request.

Cold-water control valve comprising line strainer, check valve, pressure reducing valve set to 2.1 bar

Expansion relief valve with non return valve set at 6 bar

Tundish 15mm x 22mm F x F

Temperature / Pressure relief valve set at 90 degrees Celsius and 7 bar pressure relief (factory fitted)

Motorised valve (indirect units only)

Cylinder thermostat-factory fitted to cylinder, maximum setting 85 degrees Celsius (indirect units only)

Thermal cut out set to operate at 87 degrees Celsius plus or minus 3 degrees (indirect units only)

Option – Expansion vessel with capacity as below: -

Manual backgroundManual backgroundCONNECTING THE WATER SUPPLYManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual background

Pipework is not supplied

All pipework should be installed using good plumbing practice. We recommend 22mm mains cold water supply is used.

Install a Stop Cock Valve before the cold water inlet assembly on the incoming mains water supply so the unit can be isolated if required.

Manual backgroundManual backgroundCOLD WATER VALVEManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual background

The combined cold water valve (supplied) can be connected anywhere on the cold water mains prior to the unit. It can even be located at a point near to where the mains supply enters the premises if this is more convenient. When installing the cold water valve, ensure that the arrow is pointing in the same direction as the mains water supply flow when connecting, see fig 2.

The cold water balancing port, on the valve, allows you to connect the cold water mains to the rest of the property thus giving balanced pressure throughout. If this facility is not required leave the cap on.

Manual backgroundManual backgroundDRAIN TAPManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual background

A drain tap to drain the unit must be fitted to the cold-water inlet pipe somewhere between the SCx unit and the cold water valve assembly and at as low a level as possible, see fig. 1.

Manual backgroundManual backgroundPIPEWORK TO TAPSManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual background

Ideally a 22mm pipe run should supply the outlets throughout the property with short lengths (max 1 metre) runs of 15mm going to baths, showers, and basin taps. Smaller bore pipe can be used to suit taps.

Manual backgroundManual backgroundSECONDARY CIRCULATIONManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual background

This is particularly easy to fit on the SCx units; a Swept Tee (not supplied) is needed for all indirect models if secondary circulation is required, see page 6 fig. 3 for fitting. A non-return valve (not supplied) must be fitted to prevent backflow. You will need a pump to circulate the hot water (not supplied). The return feed is in 15mm pipe and all work can be done on site.

Before commencing installation check that all the components of your SCx Unit are contained in the kit.

3KW Incoloy 825 heating element-incorporating thermostat to 70 degrees Celsius and resetable safety cut out set at 80 degrees Celsius

Tank Size

Expansion Tank Required

 

 

80 to 130 Litres

12 Litres

 

 

150 to 215 Litres

18 Litres

 

 

255 to 305 Litres

25 Litres

 

 

Typical Indirect Tank installation using external expansion vessel option

 

WATER FLOW

 

 

 

HOT WATER OUTLET

 

Fig.1

 

 

 

 

 

7 BAR / 90 DEGREES

EXPANSION VESSEL

 

 

(WALL MOUNTED)

 

 

PRESSURE &

 

 

 

 

 

TEMPERATURE

 

 

 

RELIEF VALVE.

 

WATER FLOW

 

 

 

TO COIL INLET

PRIMARY FLOW

 

 

SCx UNVENTED INSTALLATION INSTRUCTIONS

WARNING: Under no circumstances must the factory fitted temperature pressure relief valve be removed. This will totally invalidate any guarantee or claim. The cold-water inlet valve assembly must be fitted or the SCx unit will not perform satisfactorily.

DO NOT ATTEMPT TO VENT THE PRIMARY CIRCUIT THROUGH THE SCx UNIT.

All boilers should be installed to manufacturers instructions and the primary circuit through the SCx unit must be pumped.

 

 

TUNDISH

 

 

 

 

WATER FLOW TO

 

 

 

 

 

 

 

 

PRIMARY RETURN

 

 

 

 

 

MANIFOLD VIA

 

 

 

 

 

 

FLEXIBLE HOSE

 

 

 

 

 

 

 

WATER FLOW

TWIN

SECONDARY

 

6 BAR

PRESSURE

 

FROM COIL INLET

THERMOSTAT

 

 

RETURN FLOW

 

REDUCING VALVE

 

 

 

EXPANSION

 

 

 

 

SET AT 3 BAR

 

 

 

 

RELIEF

 

 

 

 

 

 

 

 

 

WATER FLOW

 

VALVE

 

 

 

 

 

 

 

 

 

 

 

 

IMMERSION

TO OVERFLOW

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

HEATER

WATER INLET

 

 

 

 

 

WATER FLOW

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

SWEPT TEE

 

 

 

 

 

 

 

 

 

 

 

 

INLET SIDE OF TANK

 

 

 

 

 

 

 

 

 

 

DRAIN

 

WATER FLOW

BLANKED

 

 

COCK

 

FROM EXPANSION

 

 

 

PORT

 

 

 

 

TANK TO 22MM

 

 

 

 

 

 

 

 

 

FEMALE THREAD

 

Manual backgroundManual backgroundSITING THE SCx UNITManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual background

The unit can be placed anywhere convenient. Because it is connected directly to the mains water supply it is equally efficient on any floor – ground, first or second. Avoid areas that may be subject to frost. Try to keep pipe runs as short as possible for maximum economy, especially hot water discharge pipes running down from the SCx unit.

The unit can be fitted into a conventional airing cupboard and does not require any additional insulation.

ALL SCx UNITS MUST BE STORED VERTICALLY

Manual backgroundManual backgroundCHECK WATER PRESSURE & FLOW RATESManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual background

We suggest 1.5 bar pressure & 15 litres / minute flow rate to be the minimum requirements for satisfactory operation. Less than this the unit will still operate but you will not be able to run two, or more, outlets at the same time. 85% of all U.K homes have more than 2-bar pressure.

The mains supply must not exceed 16 bar. If it does a special pressure-reducing valve will be required.

Important Note: - Stainless Steel Tectile push fit elbows are fitted as standard to all SCx Cylinders.

Cold water inlet valve assembly

 

 

 

 

BEHIND COVER

 

 

BALANCED

 

 

COLD WATER

 

 

 

 

 

 

OUTLET

 

 

6 BAR

 

 

EXPANSION

 

 

 

 

RELIEF

 

 

 

 

 

 

 

 

 

VALVE

 

 

 

 

 

PRESSURE REDUCING VALVE SET

 

 

 

 

 

AT 3 BAR Fig.2

 

 

 

WATER FLOW INLET SIDE OF TANK

WATER FLOW FROM EXPANSION

 

TANK TO 22MM FEMALE THREAD BEHIND

BLANKED

COVER

PORT

4

5

Page 3
Image 3
Dimplex Unvented Water Heater SCx UNVENTED INSTALLATION INSTRUCTIONS, Standard Energy Losses, SCx Performance, Drain Tap