Dometic 3200 Series owner manual Fig, Below-FloorInstallation Above-FloorInstallation

Models: 3200 Series

1 12
Download 12 pages 10.44 Kb
Page 4
Image 4
Below-Floor Installation

STEP 5a: For through-the-floor water line and electrical wires, mark another centerline 6 inches (152 mm) from the back wall (fig. 4).

Fig. 4

STEP 5b: For through-the-wall water line and electrical wires, mark a centerline 8 inches (203 mm) up from the floor centerline (fig. 5).

Fig. 5

STEP 6: Make a 4-3/4 inch (121 mm) diameter hole (for most floor flanges) or a 5-1/8 inch (130 mm) diameter hole (for swivel joint floor flange) at the centerline mark furthest from the wall. Make a 1 inch (25 mm) hole at the mark closer to the wall for the water line and electrical wires (fig. 6).

Fig. 6

IMPORTANT: The prefered installation method is to mount the floor fIange directly on the finished floor. However, if the bottom of floor flange and bottom of china toilet must be mounted at different heights, the floor flange must be mounted within 3/8 inch (10

mm)of the bottom of the toilet (see illustrations in next column) or leakage will result.

Below-Floor Installation

Above-Floor Installation

STEP 7: Insert floor flange into larger hole and secure to the floor with #12x3/4-inch long flat head wood or sheet metal screws (fig.7).

Fig. 7

STEP 8: Route 1/2-inch (13mm) PEX tubing through the smaller hole and install a PEX 1/2-inch MPT fitting (fig. 8).

NOTE: A water shut-off valve should be installed in the water line to the toilet for maintenance requirements.

Fig. 8

Page 4
Image 4
Dometic 3200 Series owner manual Fig, Below-FloorInstallation Above-FloorInstallation