STEP 9: WITH THE ELECTRICAL POWER OFF, route #14 gauge stranded copper wire from 12 VDC ground and positive 12 VDC from the fuse panel through a
Fig. 9
STEP 10: Connect the holding tank to the bottom of the discharge flange.
STEP 11: Slide the four
Fig. 10
STEP 12: Install floor flange adapter with words “THIS SIDE UP” facing up. Tighten adapter to floor flange using four flat washers and hex nuts. Tighten in
Fig. 11
IMPORTANT: If replacing an existing toilet with
STEP 13: Temporarily set the toilet in place on the floor flange (fig. 14).
Fig. 14
STEP 14: Mark the holes for the two toilet mounting bolts (fig. 15).
Fig. 15
STEP 15: Pick up toilet and set aside. Drill
Fig. 16
STEP 16: With toilet close to floor flange, connect flex- ible water supply hose to the water line fitting (fig. 17).
Fig. 17