27
EATON 350 Series Dual Path Mobile Pumps E-PUPI-TS006-E September 2007
Step 5
Insert a feedback link (item 6),
keyhole opening first, through
the flat side of the control
housing.
Step 6
On one side, turn the control
input shaft; on the other side,
guide the head pin into the
keyhole opening on the
feedback link; turn until
connection is secure.
Step 7
Insert a control spool sub-
assembly (item 7) through the
spoolboreon the control housing
(item 1).
Step 8
Once the control spool shaft is
fully inserted, turn the spool
until the dowel pin faces up.
Assembly
Mechanical Servo ControlAssembly
Step 1
Insert the knurled end of a
4mm head pin 4999869-001
in the smooth-bore hole on a
control input shaft (item 2).
Step 2
Press the head pin into place
with an arbor press.
Step 3
Fit the control input shaft, head
pin first, into a control housing
(item 1).
Step 4
With the control input shaft in
place, turn over the control
housing.
Note:
Disassembly of the Swash Plate
and Manual Servo Controller is
the reverse of the assembly
processes outlined starting on
page 25 in this manual.
56
2
3
10
41
7
89
1 1 Housing, Control
2 1 Input Control Shaft Sub-Assembly
3 2 Plug
4 3 O-Ring
5 1 Seal, Shaft
6 1 Link, Feedback
7 1 Spool Sub-Assembly
8 1 Plug
9 1 O-Ring
10 1 Set Screw
REF PART NO. QTY. DESCRIPTION