Power Edger Attachment

7

Operator's Manual

1.Blade - Rotates to provide cutting action.

2.Debris Shield/Flap - Mounted over the cutting attachment. Helps protect operator by deflecting debris produced during the edging operation.

3.Drive Shaft Assembly - Contains a specially designed liner and the flexible drive shaft.

4.Wheel - Adjustable up/down, sets depth of blade.

Contents

After opening the carton, check for damage. Immediately notify your retailer or ECHO Dealer of damaged or missing parts. Use the contents list to check for missing parts.

___ 1 -

Power Edger Attachment

___ 1 -

Operators Manual

___ 1

-

Warranty Registration Card

___ 2

-

Split Pins

___ 1 -

Locking Tool

___ 1 -

Storage Hook Assembly

Assemblypower head shaft/lower shaft assembly

Tools Required: None

Parts Required: PAS or SRM-SB Power Head w/Shaft & Coupling.

1.

Set Power Head/Shaft Assembly on a level surface.

 

B

 

 

2.

Pull locator pin (A) out, and turn counter-clockwise 1/4 turn to

D

 

lock-out position.

 

3.Remove vinyl cap from attachment drive shaft.

4.Carefully fit attachment drive shaft assembly into coupler (B) to de- cal assembly line (C), making sure that the inner lower drive shaft

engages into the square upper drive shaft socket.

A