10

5.Tighten two (2) drive shaft clamp bolts (B) securely.

A

B

B

throttle linkage and ignition leads

1.Close choke and remove air filter cover.

2.Place inner throttle cable in large hole of carburetor swivel (A).

3.Loosen nuts (B) and place threaded end of throttle linkage in bracket slot. Finger tighten nuts (B).

4.Check throttle for freedom of movement and that wide open throttle / low idle extremes are adjusted properly. If adjustment cannot be achieved with adjusting nuts (B), consult with your Echo Dealer for correct adjustment procedure. Tighten nuts (B).

5.Connect 2 ignition stop leads (C,D) from throttle cable tubing to 2 ignition leads (C,D) on engine.

6.Gather ignition wires and position behind air filter case.

7.Install air filter and cover.

A

B

CC

DD

Page 10
Image 10
Echo BRD-280 manual Throttle linkage and ignition leads