ASSEMBLY

GT-225

 

 

Nylon Line Installation

1.Shut engine off. Lay unit on the ground with head assembly up.

2.Remove old nylon line through center recess of head.

3.Thread new lines through outside holes (A) in housing until ends meet in center of recess.

Note: Insert cutting line ends to center of head recess to insure

 

easy removal of used lines.

A

 

Front (Loop) Handle

Note: Label shows minimum spacing for front handle location.

Note: Front handle is pre-installed. Re-positioning and tightening is all that is required.

1.Position front handle (A) in comfortable operating position and tighten wing nut (B). The cutting attachment should be

5-7.5 cm (2-3 in.) above the ground and as level as possible.

MIN

SPACING

A

B

14

X7722271207

© 03/2013 ECHO Inc.

Page 14
Image 14
Echo GT-225 specifications Nylon Line Installation, Front Loop Handle