Echo Assembly, GT-225ASSEMBLY, Plastic Shield Installaion, Nylon Line Head Installation

Models: GT-225

1 32
Download 32 pages 57.19 Kb
Page 13
Image 13
GT-225ASSEMBLY

GT-225ASSEMBLY

ASSEMBLY

Plastic Shield Installaion

Parts Required:

Rapid LoaderTM Head, Large washer,

 

Small washer, 3/8-24 Locknut, (2) Pre-cut

 

Nylon Line 8 in. x .080 in., Plastic Shield

 

Assemblys.

 

 

 

 

 

 

 

 

 

 

 

 

Cut-off knife on debris shield has sharp edges. Avoid contact when installing or removing line head.

Wear Gloves or personal injury may result:

Cutoff knife is sharp.

Gearcase and surrounding area may be hot.

1.Remove wing nut (A), washer (B), and bolt (C).

2.Snap the shield over the bearing housing.

3.Install bolt (C), washer (B), and wing nut (A).

Nylon Line Head Installation

B

A ASSEMBLYPlastic Shield InstallaionNylon Line Head InstallationC

1.Remove plastic threaded shaft sleeve from threaded PTO shaft.

2.Align locating hole in upper plate with hole in bearing housing and insert locking tool (A).

3.Place large washer (B) then line head (C) on threaded shaft, followed by small metal washer (D) and locknut (E).

4.Install locknut. Turn locknut clockwise, and tighten securely.

C

D

A

B

E

Remember to remove the locking tool.

X7722271207

13

© 03/2013 ECHO Inc.

Page 13
Image 13
Echo specifications Assembly, GT-225ASSEMBLY, Plastic Shield Installaion, Nylon Line Head Installation