10

ASSEMBLY

Tools Required: Locking Tools (2), Wrench 17 x 14.5 (9/16 in.)

Parts Required: Rapid LoaderTM Head, Large washer, Small washer, 3/8-24 Locknut, (2) Pre-cut Nylon Line 8 in. x .080 in., Plastic Shield Assembly

WARNING DANGER

Cut-off knife on debris shield has sharp edges. Avoid contact when installing or removing line head.

PLASTIC SHIELD INSTALLATION

1.Remove cardboard tube.

2.Remove wing nut (C), washer (B), and bolt (A).

3.Snap the shield over the bearing housing.

4.Install bolt (A), washer (B) and wing nut (C).

B

A

C

NYLON LINE HEAD INSTALLATION

B

E

1.Remove plastic threaded shaft sleeve from threaded PTO shaft.

2.Align locating hole in upper plate with hole in bearing housing and insert 5 mm (3/16 in.) diameter locking tool (A).

 

 

D

3.

Place large washer (B) then line head (C) on threaded shaft,

C

 

 

followed by small metal washer (D) and locknut (E).

 

 

 

4.

Install 3/8-24 locknut using 14.5 mm (9/16 in.) wrench. Turn locknut

 

A

 

clockwise, and tighten securely.

 

IMPORTANT

Remember to remove the locking tool.