Elkay EDFP210FPC, EDFP217FPC EDFP217FP ROUGH-INDRAWINGS, EDFP210FP*B EDFP214FP*B EDFP217FP*B

Models: EDFP210FPC EDFP214FPC EDFP217FPC

1 8
Download 8 pages 54.38 Kb
Page 5
Image 5
EDFP217FP

EDFP217FP

ROUGH-IN DRAWINGS

FIG. 4

PAGE 5

FINISHED FLOOR

97565C

1.

Wall should already be framed for the fountains using dimensions shown in Fig. 3. Shown dimensions pertain to installation location.

 

These dimensions are required for compliance with ANSI Standard A117.1. and ADA (Framing shown for reference only).

 

 

2. Remove bottom covers from fountains and save the screws.

 

 

3.

Install the fountains using bolts and washers (not provided). Tighten securely.

(Rev.J

4.

Attach drain tubes to fountains and cut to required length using the freeze resistant boxes as guides.

5.

Install freeze-resistant boxes - see box instructions.

-

6.

Replace bottom covers.

8/07)

 

 

 

 

 

 

EDFP210FP*B EDFP214FP*B EDFP217FP*B

Page 5
Image 5
Elkay EDFP210FPC, EDFP217FPC, EDFP214FPC dimensions EDFP217FP ROUGH-INDRAWINGS, EDFP210FP*B EDFP214FP*B EDFP217FP*B