Elkay EDFPVR217RC manual Installation Instructions Composite Back Panel

Models: EDFPVR217RC

1 5
Download 5 pages 24.42 Kb
Page 3
Image 3
INSTALLATION INSTRUCTIONS

EDFPVR217RC

INSTALLATION INSTRUCTIONS

COMPOSITE BACK PANEL

1.Wall should already be framed for the fountain using the positioning dimensions shown in Fig. 2. Shown dimensions pertain to installation location (framing must support up to 150 lbs. weight).

2.Install rough-in plumbing as shown in Fig. 2. Run supply water inlet line and connect to a

service stop (not provided). Turn on supply water and flush thoroughly. Close water supply.

3.Remove bottom access panel from fountain basin and save the screws. Install the fountain to the back panel and wall using (4) 5/16" bolts and washers (not provided). Bolts should be long enough to securely fasten the fountain to the wall. Tighten securely, but do not over tighten. Over tightening will crack the Marblyte Fountain.

4.Remove elbow from end of p-trap(item 1) and attach it to drain tube. Re-attach elbow to p-trap and cut waste tube to required length using plumbing hadware and trap as guide.

5.Make water supply connections from service stop to the fountain strainer (Item 16) by inserting the water inlet line into the inlet side of strainer until it reaches a positive stop about 3/4", (See Figure 6, Page 7). Turn on water supply and check for leaks. Newly installed water supply line should be insulated after leak check is completed. DO NOT SOLDER TUBES INSERTED INTO THE STRAINER

AS DAMAGE TO THE O-RINGS MAY RESULT.

6.These products are designed to operate on 20-105 PSIG supply line pressure. If inlet pressure is above 105 PSIG, a pressure regulator must be installed in the supply line. Any damage caused by reason of connecting these products to supply line pressure lower than 20 PSIG or higher than 105 PSIG is not covered by warranty.

7.Check stream height from bubbler. Stream height is factory set at 45-50 PSI. If supply pressure varies greatly from this, adjust the screw on regulator item 14 by using a small screwdriver through the small hole in the push button item 8 (See Fig.3). Clockwise adjustment will raise stream height and counter- clockwise adjustment will lower stream height. For best adjustment stream height should be approxi- mately 1-1/2" (38mm) above the bubbler.

8.Replace bottom access panel to fountain basin using screws provided. Tighten securely.

Care and Maintenance of ELKAY Composite Fountains

Elkay Composite fountains provide an exremely durable, nonporous surface which resists staining. Care is very simple. Routine cleaning with a soft sponge or cloth, or with water or non-abrasive aerosol foam cleaner, is all that is normally needed to give many years of trouble free service. Cleaners left standing on the fountain surface can dull the surface finish. Be certain to rinse all cleaning agents completely and polish with a soft cloth.

Harsh abrasive cleaners are not required and should not be used.

Mild abrasives such as liquid automotive cleaning compound or baking soda paste will remove simple scratches and stains. Cigarette burns can normally be removed without noticeable effect. Deeper scratches or gouges can be corrected with fine grit sandpaper (240 grit then 400 grit) or a green Scotchbrite pad.

To maintain or regain luster and make cleaning easier, periodic applications of automobile wax or like products will keep the finish looking like new.

PAGE 3

98409C (Rev. B - 9/08)

Page 3
Image 3
Elkay EDFPVR217RC manual Installation Instructions Composite Back Panel, Care and Maintenance of ELKAY Composite Fountains