Elkay ERW20-2B installation instructions Installation Instructions, ERW20-1B/2B

Models: ERW20-1B ERW20-2B

1 2
Download 2 pages 59.94 Kb
Page 1
Image 1
ERW20-1B/2B

ERW20-1B/2B

Installation Instructions

ERW20-1B/2B

Refrigeration Packages

NOTE: It is important to insure proper ventilation. Allow a minimum clearance of 12 inches (305 mm) in front and 3 inches (76mm) in the rear of the unit. If unit is to be installed in an enclosure, allow the following clearances around unit - 1 inch (25mm) each side, 3 inches (76mm) in the rear, 3 inches (76mm) inches above wall.

This chiller has been designed for use with potable water and includes an o-ring seal on the drain plug. The fitting should be replaced if the unit is to be used with more aggressive fluids.

For use with photo processing applications, adjust cold control to warmer settings.

LEGEND

A = 3/8" O.D. TUBE WATER OUT

B = 3/8" O.D. TUBE WATER INLET

C = 3/8" O.D. TUBE TANK DRAIN

97560C (REV B - 4/00)

Page 1
Image 1
Elkay ERW20-2B installation instructions Installation Instructions, ERW20-1B/2B Refrigeration Packages