Applying Power

To apply power:

1.Verify that the HBA is securely installed in the computer.

2.Verify that the correct media is attached.

3.Plug in and turn on the computer.

4.Observe LEDs for Power On Self Test (POST) results.

Viewing the LEDs

Green and yellow LEDs can be seen through openings in the HBA's mounting bracket.Green indicates firmware operation and yellow signifies port activity. Each port has a corresponding set of green and yellow LEDs.

Figure 4: LEDs

POST Conditions and Results

POST conditions and results are summarized in the following table:

Note: For the Link Rate conditions, there is a 1 Hz pause when the LED is off between each group of fast blinks (1, 2 or 3). You should observe the LED sequence for several seconds to ensure that the pause is correctly identified.

Table 4: POST Conditions and Results

 

Yellow LED

Green LED

State

 

 

 

 

 

 

Off

Off

Wake-up failure (Dead board)

 

 

 

On

Off

POST failure (Dead board)

 

 

 

Slow Blink

Off

Wake-up failure monitor

 

 

 

Fast Blink

Off

POST failure

 

 

 

Flashing

Off

POST processing in progress

 

 

 

Off

On

Failure while functioning

 

 

 

On

On

Failure while functioning

 

 

 

 

1

Fast Blink

On

1Gb Link rate -Normal, link up

 

 

 

 

2

Fast Blinks

On

2Gb Link rate -Normal, link up

 

 

 

 

3

Fast Blinks

On

4Gb Link rate -Normal, link up

 

 

 

Off

Slow Blink

Normal -link down or not started

 

 

 

 

LPe11002 Hardware Installation Manual

Page 6

Page 9
Image 9
EMC LPE11002EG installation manual Applying Power, Viewing the LEDs, Post Conditions and Results