3.Mount the motor base using the recommended grade 5 bolts (Leave the bolts loose enough to allow the motor base to be moved to align the sheaves)

4.Set the motor base carriage to the center of the motor base by adjusting the tension rod until dimension A and B are equal.

A

B

5.Align the motor base to position the sheaves in the proper location. A straight edge should be used to align the sheave to be parallel and in the same plane. When this is achieved the straight edge will be flush to the sides of both sheaves as shown.

7.Rotate the tension rod counterclockwise enough to allow the belt to slip over the two sheaves by hand. (Prying the belts over the sheaves with any device can damage the belts or sheaves)

9.Use a wrench to tighten the tension rod turning clockwise until the belt feels tight.

6.Tighten the motor base mounting bolts using the recommended grade 5 bolts and torques listed in table 1.

8.Manually pull the motor base back by hand in the direction shown and rotate the tension rod clockwise until hand tight.

10.Check the belt tension using Browning Belt Tension Checker.

2

Page 2
Image 2
Emerson 600 installation instructions Check the belt tension using Browning Belt Tension Checker