2 – Voltage Checks

INSTALLATION (continued)

GREEN RED

observe these lights

GREEN RED AMBER

Figure 1-6. Standard controls and indicators.

2 – Voltage Checks

First check nameplate on transfer switch; rated voltage must be the same as normal and emergency line voltages.

Before energizing the switch check to be sure that both normal and emergency contacts are not left in the closed position.

Verify that the feeders have been connected to the proper lugs.

Use extreme caution when using a meter to measure voltages. Do not touch power terminals; shock, burns, or death could result !

Perform steps 1 through 6 at the right. Observe the status lights. See Figure 1–6.

QBlack square means light is on. S White square means light is off.

*If necessary, adjust voltage regulator on the generator according to the manufacturer’s recommendations. The Automatic Transfer Switch will respond only to the rated voltage specified on the Transfer Switch nameplate.

Note

Refer to Section 3 of Group 5 Controller User’s Guide 381333–126 for how to display the Status of the ATS and the Voltage and Frequency of each source.

Now continue to 3 – Electrical Operation on next page.

1--4

Close the normal source circuit breaker. The Transfer Switch

1Connected To Normal and the

 

Normal Source Accepted lights

Active

 

 

Load

 

 

Disconnect

 

should come on.

 

 

Use an accurate voltmeter to

 

 

check phase to phase and

 

2 phase to neutral voltages pres-

 

 

ent at the transfer switch normal

 

 

source terminals.

 

 

Close the emergency source

 

 

circuit breaker. (Start generator,

 

3

if necessary.) The Transfer

 

Switch Connected To Normal &

Load

 

Emergency Source Accepted

Disconnect

 

Active

 

lights should come on.

 

 

Use an accurate voltmeter to

 

 

check phase to phase and

 

4 phase to neutral voltages pres-

 

 

ent at the transfer switch emer-

 

 

gency source terminals.*

 

 

Use a phase rotation meter to

A B C

 

 

5

check phase rotation of emer-

 

gency source; it must be the

 

 

same as the normal source.

 

 

Shut down the engine–genera-

 

 

tor, if applicable. The Emergen-

 

 

cy Source Accepted light should

 

6 go off. Then put the starting

 

 

control selector switch (on the

Active

 

 

Load

 

 

Disconnect

 

generator set) in the automatic

 

 

position. Close enclosure door.

 