Empire Products FAW-40-1IP, FAW-40-1SPP Ip System Troubleshooting Sequence

Models: FAW-40-1IP FAW-40-1SPP

1 36
Download 36 pages 59.71 Kb
Page 14
Image 14
IP SYSTEM TROUBLESHOOTING SEQUENCE

START

IP SYSTEM TROUBLESHOOTING SEQUENCE

Turn OFF Gas Supply

Disconnect System Control Harness

Set Thermostat to Call for Heat

Check for Proper Voltage at

SmartValveTM System Troubleshooting Sequence

Note: Before Troubleshooting, Become Familiar

with the Sequence of Operation

INSET A

24Volt

Thermostat

24 Volts

24 Volt

Common 24

Volts

End View

of Control

Harness

Connector

EFT

Output

24 Volt

Hot

Control Harness (See Inset A - Voltage Should be 24V Between Thermostat and 24V Common, and 24V Between 24V Common and 24V Hot.)

YES

Plug Harness into SmartValve Control

NO

Check

Line Voltage Power

 

Low Voltage Transformer

Limit Controller

Thermostat

Wiring

INSET B

HSI

Terminals

Wait for Internal Check Delay (SV9501)

Igniter Warms UP and Glows Red

Note: Igniter Will Cycle OFF

and Back ON Once During the

90 Second Ignition Trial

Manual background YES

Turn On Gas Supply

Pilot Burner Lights

YES

Main Valve Opens and

Main Burner Lights

YES

System is Okay

NO

NO

NO

Unplug Pilot Burner Cable.

Measure Voltage at SmartValue HSI

Element Output (See Inset B) 24V

Manual background Nominal

Replace Igniter/Flame Rod

Assembly

Reconnect Pilot Burner Cable

Check that Pilot Gas is Flowing Wait to Assure Pilot Gas Tubing is Purged.

Measure Voltage Between 24V Hot and 24V Common Leads to SmartValve Control. Must Measure at Least 19.5 VAC with Igniter Powered. See Inset A to Identify Proper Lead. This Check Must be Done with the SmartValve Control Connected and Igniter Powered.

Replace Igniter/Flame Rod

Assembly

Check that Pilot Flame Makes Good Contact with Pilot Burner Flame Rod

Check for Good Electrical Connection Through the Pilot Tubing

If Both of the Above are Good, Replace Igniter/Flame Rod

Cycle Thermostat OFF and Back

ON

Main Burner Lights

NO

Replace SmartValve Control

 

Reconnect Pilot Burner Cable

NO

Replace SmartValve Control

 

NO

Check Transformer and Line Volt

Supply

 

NO

Replace SmartValve Control

 

Page 14

12427-4-0306

Page 14
Image 14
Empire Products FAW-40-1IP, FAW-40-1SPP installation instructions Ip System Troubleshooting Sequence