VIII. Low Water Cut Off (LWCO)

WARNING

DO NOT ATTEMPT to cut factory wires to install an aftermarket Low Water Cut Off (LWCO). Only use connections specifically identified for Low Water Cut Off.

In all cases, follow the Low Water Cut Off (LWCO) manufacturer's instructions.

When

A low water cutoff is required to protect a hot water boiler when any connected heat distributor (radiation) is installed below the top of the hot water boiler (i.e. baseboard on the same floor level as the boiler). In addition, some jurisdictions require the use of a LWCO with a hot water boiler.

Where

The universal location for a LWCO on both gas and oil hot water boilers is above the boiler, in either the supply or return piping. The minimum safe water level of a water boiler is at the uppermost top of the boiler; that is, it must be full of water to operate safely.

What Kind

Typically, in residential applications, a probe type LWCO is used instead of a float type, due to their relative costs and the simplicity of piping for a probe LWCO.

How to Pipe

A “tee” is commonly used to connect the probe LWCO to the supply or return piping, as shown below.

LWCO Location

Select the appropriate size tee using the LWCO manufacturer’s instructions. Often, the branch connection must have a minimum diameter to prevent bridging between the probe and the tee. Also, the run of the tee must have a minimum diameter to prevent the end of the probe from touching or being located too close to the inside wall of the run of the tee.

Ideally, manual shutoff valves should be located above the LWCO and the boiler to allow for servicing. This will allow probe removal for inspection without draining the heating system. Many probe LWCO

manufacturers recommend an annual inspection of the probe.

How to Wire

LWCO’s are available in either 120 VAC or 24 VAC configurations. The 120 VAC configuration can be universally applied to both gas and oil boilers by wiring it in the line voltage service to the boiler (after the service switch, if so equipped).

The presence of water in a properly installed LWCO will cause the normally open contact of the LWCO to close, thus providing continuity of the 120 VAC service to the boiler.

It is recommended to supply power to the probe LWCO with the same line voltage boiler service as shown below.

Wiring of Typical LWCO

A 24 VAC LWCO is used primarily for gas fired boilers where a 24 volt control circuit exists within the boiler. However, a 24 VAC LWCO can only be used if the boiler manufacturer has provided piping and wiring connections and instructions to allow for this application.

How to Test

Shut off fuel supply. Lower water level until water level is BELOW the LWCO. Generate a boiler demand by turning up thermostat. Boiler should not attempt to operate. Increase the water level by filling the system. The boiler should attempt to operate once the water level is above the LWCO.

45

Page 45
Image 45
Energy Tech Laboratories F3, 40 Series, CL Series, F5 manual VIII. Low Water Cut Off Lwco, When

F3, F5, 40 Series, CL Series specifications

Energy Tech Laboratories has made significant strides in innovation and sustainability with its well-regarded CL Series, 40 Series, F5, and F3 product lines. Each series is designed to provide scalable energy solutions tailored to meet diverse industry demands while promoting efficiency and environmental responsibility.

The CL Series stands out for its compact design and modular construction. It is ideal for small to medium-sized enterprises looking to optimize energy consumption. One of the primary features of the CL Series is its advanced energy management system, which uses real-time data analytics to help users monitor and analyze their energy usage patterns. Additionally, it is equipped with a regenerative braking technology that captures and reuses energy, making it exceptionally efficient.

In contrast, the 40 Series is targeted towards larger industrial applications. This series boasts high-capacity energy storage solutions and integrates seamlessly with existing systems. One of its most remarkable features is its adaptive load management system, which intelligently distributes power based on real-time demand, ensuring maximum efficiency and minimal waste. The 40 Series is also built with robust safety protocols, including fire suppression systems and advanced fault detection technologies.

The F5 model is engineered for ultimate performance. It incorporates cutting-edge battery technology that enhances energy density, resulting in longer operational life and reduced maintenance costs. Its real-time monitoring capabilities offer users the ability to track performance metrics from anywhere, further enabling proactive decision-making. Additionally, the F5 features a modular battery design, allowing for easy upgrades and expansions as energy needs grow.

Finally, the F3 series exemplifies the future of energy technology with its innovative approach to renewable energy integration. The F3 is designed to work with solar and wind energy systems, leveraging advanced algorithms to maximize energy capture from these sources. Users benefit from its intelligent grid interface, which allows for efficient energy distribution within microgrid configurations.

In summary, Energy Tech Laboratories’ CL Series, 40 Series, F5, and F3 combine robust engineering and innovative technologies to address the varying energy needs of users. With features like real-time monitoring, adaptive load management, and renewable energy integration, these product lines not only enhance operational efficiency but also contribute to a sustainable energy future. As industries increasingly look towards improving energy practices, these series stand out as relevant, viable solutions in the evolving landscape of energy technology.