Enterasys Networks VH-8G-L3 manual Desktop or Shelf Installation, Rack Installation

Models: VH-8G-L3

1 41
Download 41 pages 50.21 Kb
Page 31
Image 31

Desktop or Shelf Installation

When installing the Switch on a desktop or shelf, the rubber feet included with the device should first be attached. Attach these cushioning feet on the bottom at each corner of the device. Allow adequate space for ventilation between the device and the objects around it.

Figure 2-1. Installing rubber feet for desktop installation

Rack Installation

The VH-8G-L3 can be mounted in an EIA standard-sized, 19-inch rack, which can be placed in a wiring closet with other equipment. To install, attach the mounting brackets on the switch’s side panels (one on each side) and secure them with the screws provided.

Figure 2- 2A. Attaching the mounting brackets

Then, use the screws provided with the equipment rack to mount the Switch on the rack.

21

9033705-01

Page 31
Image 31
Enterasys Networks VH-8G-L3 manual Desktop or Shelf Installation, Rack Installation