9033705-01 20
2. Installation Inspecting Your Shipment
Open the shipping carton of the Switch and carefully unpack
its contents. The carton should contain the following items:
One VH-8G-L3 8-port Gigabit Ethernet Layer 3
Switch.
Mounting kit: 2 mounting brackets and screws.
Four rubber feet with adhesive backing.
One AC power cord.
One ESD wrist strap.
Product Documentation.
If any item is found missing or damaged, please contact your
local Enterasys sales agent for replacement.
Installation
Use the following guidelines when choosing a place to install
the Switch:
The surface must support at least 3 kg.
The power outlet should be within 1.82 meters (6
feet) of the device.
Visually inspect the power cord and see that it is
secured to the AC power connector.
Make sure that there is proper heat dissipation from
and adequate ventilation around the Switch. Do not
place heavy objects on the Switch.