EPSON Stylus C63/64/83/84

Revision A

1.3.8 Front frame removal

￿External view

Screw type : C.B.S TITE SCREW, 3x6, F/ZN

 

Screw type : C.B.S TITE SCREW, 3x6, F/ZN

Order of tightening : First

 

Order of tightening : Second

Thghtening torque : 8±1 kgf.cm

 

Thghtening torque : 8±1 kgf.cm

 

 

 

1)Return CR unit to home position before removing Front frame.

2)Remove two screws for securing Front frame to main frame.

3)Lift up the left side of Front frame slightly, and slide the frame toward the front side of the printer.

￿Do not damage [Pulley, Eject, Driven] when sliding the

CAUTION

Front frame to the left side of the printer.

 

￿When assembling Front frame to main frame,

Front frame

Star wheel holder

Star wheel eject holder

Figure 1-11. Front frame removal￿Part/Unit that should be removed before removing Paper guide front

Housing (Right/Left/Frame)

￿Prcedure of removal

ADJUSTMENT ￿

REQUIRED

￿Make sure that the Star wheel holder & Star wheel eject holder is correctly fixed.

￿Make sure that the Star wheel moves smoothly.

￿Fasten two screws for securing Front frame to main frame in the order/tightening torque indicated in the figure.

￿Make sure that the CR unit moves smoothly.￿Make sure that there is no gap between Front frame frame main.￿Do not hold Front frame while handling printer mechanism in your repair.

When you replace Front frame with new one, lubricate it with the suitable amount of G-58 grease by the specified position.

￿The following procedure is only for Front frame removal.

CAUTION

In case that Front frame is removed for CR unit removal,

 

 

there is some added operations before Front frame removal.

 

As for the detailed procedure, refer to 1.2.7 "CR motor

 

removal".

￿When Front frame is removed or replaced with new one, the following adjustment must be performed in the order below.

1)PF adjustment2)Bi-d adjustment

Disassembly and Assembly

Disassembly

22