| Replacement |
|
|
Combined Model Name | Cartridge | Flow Rate | Capacity |
|
|
|
|
QC7I Triple - MC | MC | 5.0 gpm (18.9 lpm) | 27,000 gal (102,000 L) |
QC7I Triple - MC2 | MC2 | 5.0 gpm (18.9 lpm) | 27,000 gal (102,000 L) |
QC7I Triple - MH | MH | 5.0 gpm (18.9 lpm) | 27,000 gal (102,000 L) |
QC7I Triple - MH2 | MH2 | 5.0 gpm (18.9 lpm) | 27,000 gal (102,000 L) |
QC7I Triple - TO | TO | 4.5 gpm (56.7 lpm) | 90,000 gal (340,650 L) |
QC7I Triple - CV | CV | 5.0 gpm (18.9 lpm) | 22,500 gal (85,170 L) |
QC7I Triple - XCV | XCV | 5.0 gpm (18.9 lpm) | 30,000 gal (113,550 L) |
QC7I Triple - XC | XC | 5.0 gpm (18.9 lpm) | 36,000 gal (136,260 L) |
QC7I Triple - XC2 | XC2 | 5.0 gpm (18.9 lpm) | 36,000 gal (136,260 L) |
QC7I Triple - 7CB5 | 7CB5 | 7.5 gpm (28.2 lpm) | 30,000 gal (113,550 L) |
QC7I Triple - | 7.5 gpm (28.2 lpm) | 30,000 gal (113,550 L) | |
QC7I Triple - | 7.5 gpm (28.2 lpm) | 30,000 gal (113,550 L) | |
| Replacement |
|
|
|
|
| |
Combined Model Name | Cartridge | Flow Rate | Capacity |
|
|
|
|
QC7I Quad - MC | MC | 6.6 gpm (25 lpm) | 36,000 gal (136,000 L) |
QC7I Quad - MC2 | MC2 | 6.6 gpm (25 lpm) | 36,000 gal (136,000 L) |
QC7I Quad - MH | MH | 6.6 gpm (25 lpm) | 36,000 gal (136,000 L) |
QC7I Quad - MH2 | MH2 | 6.6 gpm (25 lpm) | 36,000 gal (136,000 L) |
QC7I Quad - TO | TO | 6.0 gpm (22.4 lpm) | 120,000 gal (454,200 L) |
QC7I Quad - CV | CV | 6.6 gpm (25 lpm) | 30,000 gal (113,550 L) |
QC7I Quad - XCV | XCV | 6.6 gpm (25 lpm) | 40,000 gal (151,400 L) |
QC7I Quad - XC | XC | 6.6 gpm (25 lpm) | 48,000 gal (181,680 L) |
QC7I Quad - XC2 | XC2 | 6.6 gpm (25 lpm) | 48,000 gal (181,680 L) |
QC7I Quad - 7CB5 | 7CB5 | 10.0 gpm (37.6 lpm) | 40,000 gal (151,400 L) |
QC7I Quad - | 10.0 gpm (37.6 lpm) | 40,000 gal (151,400 L) | |
QC7I Quad - | 10.0 gpm (37.6 lpm) | 40,000 gal (151,400 L) |
* For individual cartridge specifications, refer to cartridge literature.
Temperature:
Pressure: 10 - 125 psi (0.7 - 8.6 bar),
INSTALLATION
1.Use the predrilled mounting holes in the manifold bracket as guides. Mark and drill anchor holes. Mount securely. See Figures
2.Shut off power to machine.
3.Connect outlet port of QC7I unit to equipment served. Always use a NSF approved pipe dope or Teflon tape at all connections. Use a backup wrench on all fittings while connecting to avoid excessive stress on the system components.
Note: If the optional
4.Connect minimum 3/8” water line to inlet side of QC7I singles. Use minimum 1/2” line for other systems.
5.The cross fitting has a flushing valve installed on the bottom. Connect tubing to flushing valve and run to drain.
Note: Some municipal plumbing codes and good sanitary practices require an air gap at the drain termination point.
6.Install the cartridge(s) into the QC7I head (s) following directions on the cartridge label or as shown in the Cartridge Change illustrations.
7.Turn on water to filter and check for leaks.
8.Flush the cartridge by running water through at full force for five minutes. This will set the filtering media and purge air and fines, insuring maximum filter life.
9.After flushing, close the flushing valve, turn on power to equipment and plug the LPA (if so equipped) into the electrical outlet. See illustrations.
5.60"
INLET | OUTLET |
3/8" FNPT | 3/8" FNPT |
27.50"
Figure 5 – Single System
16.60"
OUTLET
3/4" FNPT
INLET 3/4" MNPT
25.26"
Figure 6 – Twin System
21"
OUTLET
3/4" FNPT
INLET 3/4" MNPT
29.26"
Figure 7 – Triple System
24.60"
OUTLET
3/4" FNPT
INLET 3/4" MNPT
29.69"
Figure 8 – Quad System
Check for compliance with state and local laws and regulations. Do not use with water that is microbiologically unsafe or of unknown quality without adequate disinfection before or after the system. Systems certified for cyst reduction may be used on disinfected waters that may contain filterable cysts.