Maintenance
Voltage | Percent | Maximum | Charging | |
Reading | Charge | Charger | Interval | |
|
| Settings |
|
|
12.6 or | 100% | 16 volts/7 | No | |
greater |
| amps | Charging | |
|
|
| Required | |
12.4 – 12.6 | 16 volts/7 | 30 Minutes | ||
|
| amps |
|
|
12.2 – 12.4 | 16 volts/7 | 1 | Hour | |
|
| amps |
|
|
14.4 volts/4 | 2 | Hours | ||
|
| amps |
|
|
14.4 volts/4 | 3 | Hours | ||
|
| amps |
|
|
Figure 12
11.7 or less 0% | 14.4 volts/2 | 6 Hours or |
| amps | More |
Check Mower Blades
Service Interval: Before each use or daily
1.Use wrench here for blade installation. This nut has been torqued to
2.Torque to
1.Stop engine, wait for all moving parts to stop, and remove key. Engage parking brake.
2.Lift deck and secure in raised position as stated in the Clean Grass
3.Inspect blades and sharpen or replace as required.
4.Reinstall the blades (if they were removed) in the following order:
A.Install bushing through blade with bushing flange on bottom (grass) side of blade.
C.Apply lubricant to threads of blade bolt as needed to prevent seizing.
WARNING
Incorrect installation of the blade or components used to retain the blade can be dangerous. Failure to use all original components and assembled as shown could allow a blade or blade component to be thrown out from under the deck resulting in serious personal injury or death.
Always install the original Exmark blades, blade bushings, and blade bolts as shown.
Figure 11
1.Install bushing in blade prior to installing bushing in spindle.
B.Install bushing/blade assembly into spindle.
Check Safety Interlock System
Service Interval: Before each use or daily
Note: To prevent engine