Exmark Metro 21, Metro 26 manual

Models: Metro 21, Metro 26

1 40
Download 40 pages 19.61 Kb
Page 32
Image 32

FIGURE 28

4.Gently apply one to two pumps of #2 multi-purpose lithium-base grease.

5.Re-install gear case access cover.

6.Install the grass bag.

5.15Adjusting the Blade Brake Cable:

Service Interval: Adjust whenever a new blade brake cable assembly it installed

1.Stop the engine and wait for all moving parts to stop.

2.Disconnect the wire from the spark plug (Fig. 8).

3.Remove belt cover

4.Loosen the blade brake cable nuts until the cable conduit slides (Fig. 29)

FIGURE 29

5.Pull the cable to remove the slack, but do not put tension on the spring.

6.Tighten the blade brake cable nut to lock the adjustment in place.

7.Re-install the belt cover.

8.Connect the wire to the spark plug.

5.16Servicing the Wheels: Removing the Wheels

1.Stop the engine and wait for all moving parts to stop.

2.Disconnect the wire form the spark plug (Fig. 8).

3.Remove the hardware as shown (Fig. 30 & 31).

- 27 -

Page 32
Image 32
Exmark Metro 21, Metro 26 manual