Installation, Operation and Maintenance

Installation, Operation and Maintenance

1.5 Through 5 Ton

Split System Air Conditioner

TABLE OF CONTENTS

 

INTRODUCTION

1

NOTES TO INSTALLER

1

RECOGNIZE SAFETY SYMBOLS, WORDS AND LABELS

1

CODES

1

INSPECTION AND UNPACKING

1

INSTALLATION

 

Clearances

2

Support

2

Exposure

2

Proximity to Evaporator

2

ELECTRICAL CONNECTIONS

2

SERVICE VALVE CONNECTIONS

 

Braze Joints

3

Evacuation

3

Opening the Service Valve (Step Valve)

3

CONNECT REFRIGERANT PIPING

4

Precautions

4

Liquid Line Sizes

4

Suction Line Sizes

4

SUBCOOLING CHARGING

5

OPERATION INSTRUCTIONS

5

MAINTENANCE INSTRUCTIONS

5

CONDENSING UNIT NOMENCLATURE

6

LIMITED WARRANTY

7

NOTE:

THESE INSTRUCTIONS ARE INTENDED AS AN AID TO QUALIFIED

SERVICE PERSONNEL FOR PROPER INSTALLATION, ADJUSTMENT

AND OPERATION OF THIS EQUIPMENT. READ THE ENTIRE

INSTRUCTION MANUAL THOROUGHLY BEFORE ATTEMPTING

INSTALLATION OR OPERATION.

Page 1
Image 1
Fedders warranty Table Of Contents, Through 5 Ton Split System Air Conditioner, Installation, Operation and Maintenance