(1,2) -2- 599684B DD60D installA2 NZGB.indd 6/7/09 11:49:38 AM

8SECURE THE PRODUCT AND REFIT THE DRAWER

A

The product has three pairs of mounting brackets: a pair of optional brackets on the top (C) and two pairs of formed brackets in the side of the chassis (A,B). Use at least two out of the three pairs to secure the product.

Ensure the sound

insulation is repositioned correctly.

optional

C

C

max. 19 mm

BB

A A

B

5

Ensure the drawer clips on

 

both sides are reset.

4

4

Ensure the drawer is now rotated clockwise back.

1

3

Before refitting the drawer, ensure the hoses are not twisted and the latches at the rear of each drawer runner are facing forward.

2

9FIT THE TOEKICK

A

Where the toekick meets the bottom of the tub is the cut-off point

1

2

3

B

4

5

6

7

 

 

19

 

 

8

9

 

Important!

D o not overtighten screw.

10

Page 6
Image 6
Fisher & Paykel DD60D manual Secure the Product and Refit the Drawer, FIT the Toekick