Getting Started

Receiving Inspection 2

Section 2

Getting Started

2.1 Receiving Inspection

Upon receipt of the unit:

1.Inspect the carton(s) and contents for damage. If damage is evident, file a claim with the carrier and notify Fluke Biomedical, Radiation Management Services at 440.248.9300.

2.Remove the contents from the packing material.

3.Verify that all items listed on the packing list have been received and are in good condition.

NOTE

If any of the listed items are missing or damaged, notify

Fluke Biomedical.

2.2 Mounting

The mounting bracket supplied (P/N 102007) may be attached to any convenient vertical mounting surface. Before mounting the bracket to the wall, however, make sure that the 6 ft. converter power cord will reach the nearest power outlet.

The wall-mounting bracket comes supplied with double-sided foam tape already attached. Just peel off the protective paper covering and firmly apply to the mounting surface.

CAUTION

Once in place the bracket cannot be moved or removed without destroying the tape. Make sure of your installation site before applying.

2.3 Power

The plug on the end of the converter power cord should first be inserted into the larger jack on the bottom of the Primalert. The converter should then be plugged into the wall outlet.

Note that when first connected to power, the Primalert may alarm for as long as three seconds before the automatic reset is actuated.

2-1

Page 9
Image 9
Fluke 05-437 manual Getting Started, Receiving Inspection, Mounting, Power