Fluke 76-908, 76-907 user manual Nuclear Associates, Operators Manual

Models: 76-908 76-907

1 26
Download 26 pages 13.35 Kb
Page 10
Image 10
The flood phantom has a uniform solution, the image of which can be used to measure the uniformity in signal intensity in the images. The grid section consists of grids that can be used to assess geometric linearity.

Nuclear Associates 76-908 & 76-907

Operators Manual

The flood phantom has a uniform solution, the image of which can be used to measure the uniformity in signal intensity in the images. The grid section consists of grids that can be used to assess geometric linearity.

A small pancake shaped container holding producing solution is attached on the diagonal surface of the phantom. It is used to detect phase errors.

1-6

Page 10
Image 10
Fluke 76-908, 76-907 user manual Nuclear Associates, Operators Manual