PARTS LIST

ASSEMBLY INSTRUCTIONS

ADULT INSTALLATION REQUIRED.

A

B

TOOLS REQUIRED:

Level (A)

 

 

Measuring tape (B)

 

 

Power drill with 7/32”, 1/8” and 1/2” masonry bits (C)

C

D

Power screwdriver with bull nose phillips bit (D)

READ ALL INSTRUCTIONS BEFORE ASSEMBLY OF Diaper Changing Station.

 

Unpack carton and identify all parts.

 

 

IMPORTANT NOTE:

The EZ MountBacker Plate may or may not be included with the model you purchased. The backer plate is intended to reduce installation time and costs as well ensure connection to two studs. Safe installation can also be achieved without the use of the backer late by following the instructions provided.

If your model did not include an EZ MountBacker Plate and you have determined that you would like to purchase one, please contact us at 1-877-716-2757 if you have any questions. The part number is A100-BPEH.

Parts Description

 

 

Quantity

Hardware for installation:

 

 

4

3” Wood Screws

 

 

3/4” Finishing Washers

 

 

4

3” Machine Screws

 

 

2

3/4” Flat Washers

 

 

4

ToggleAnchors

 

 

2

1-1/4” Caps

 

 

6

Door / Wall Plate

For Wood Studs:

 

1

 

For Use With Toggle Anchors:

3” Wood Screws

3/4” Finishing Washers 3/4” Flat Washers

3” Machine Screws

3/4” Flat Washers

Toggle Anchors

1-1/4” Caps

 

 

 

 

 

Door

 

/

 

wall plate to be

 

 

 

 

 

 

 

 

 

 

 

 

mounted on outside of

 

 

 

 

 

restroom door.

 

 

15

-3/8”

 

 

 

 

 

 

 

 

(390

mm)

A.D.A. Compliance:

Maximum Protruding Objects

 

 

 

 

4.4.1

 

 

 

 

4.2.5

Forward Reach

 

 

 

 

4.2.6

Parallel Approach

34-1/4”

 

 

 

4.27.4

Operation

 

 

 

Compliant when properly installed.

(870 mm)

17-1/2”

 

 

 

1

 

 

 

 

 

 

 

 

(445 mm)

 

 

 

 

 

 

 

Page 2
Image 2
Foundations 100-EHBP manual Assembly Instructions, Adult Installation Required Tools Required