2.Using #10 x ⁷⁄₈"
3.Turn the adjustment bolt for each bracket until the bolt touches the wall.
4.Turn the locking nut on adjustment bolt to lock in position.
A
B
C
A. Support bracket
B. Locking nut
C. Adjustment bolt
Complete Installation
1.Insert seal behind the top of the lower window sash and against the glass of the upper window.
2.Place one
3.Use a ³⁄₃₂" drill bit to drill a starter holes through the holes in each bracket into the window sash.
4.Attach both
| C |
| B |
A | A |
A. Window lock brackets
B. Window rail seal
C. Upper window glass
Through-the-Wall Cabinet Installation
NOTES:
�Handle air conditioner gently.
�Be sure your air conditioner cabinet does not fall out of the opening during installation or removal.
�The place where the power cord exits the air conditioner should be no more than 4 ft (122 cm) from a grounded 3 prong outlet.
�It is the customer's responsibility and obligation to have this product installed by a qualified technician familiar with
�Do not block the louvers on the front panel.
�Do not block the louvers on the outside of the air conditioner.
Option 1—Wood, metal or plastic molding
When using a wood, metal or plastic molding, the wood frame should line up with inside wall as shown.
A B C
Option 2—Plastered wall with no molding
If the plastered wall is to be flush with the cabinet and no molding is used, the wood frame must be set ¹⁄₂" (13 mm) into the inside wall.
A B C
D
A. Plastered wall | C. Wood frame |
B. Inside wall | D. Louvers |
A. Molding | C. Wood frame |
B. Inside wall | D. Louvers |
Install Wood Frame
D1. Construct wood frame. See “Location Requirements” for dimensions.
2.Measure outside width and height of frame to determine wall opening dimensions.
3.Cut opening through the wall. Remove and save insulation.
NOTES:
�Dimension for depth depends on wall thickness and type of molding.
�Do not block louvers in air conditioner cabinet.
9