2-52.4 Connection to Gas LineThe H52 Series has received the CE mark for the countries and gas categories indicated in theaccompanying table. NOTE: The nominal heat input (Qn) is 21kW except for AT, DE, LU, and forcategory 3B/P under 50 mbar, which is 23kW.
COUNTRIES CATEGORIES GAS PRESSURE (mbar)
G20 20
G30, G31 50
I2E(R)B G20, G25 20, 25
I3+ G30, G31 28-30, 37
G20 20
G30, G31 30
G20, G25 20, 25
G30, G31 28-30, 37
G20, G25 20, 25
G31 50
G20 20
G30, G31 30
G20, G25 20
G30, G31 50
I3P G31 50
G20 20
G30, G31 28-30, 37
G20 20
G30, G31 28-30, 37
G20 20
G30, G31 28-30, 37
G20 20
G30, G31 50
G25 25
G31 50
G25 25
G30, G31 30
NORWAY (NO) I3B/P G30, G31 30
G20 20
G30, G31 28-30, 37
G20 20
G30, G31 28-30, 37
G20 20
G31 37, 50
G20 20
G30, G31 30
G20 20
G30, G31 28-30, 37
II2ELL3B/P
II2H3B/P
II2Esi3+
II2Esi3P
II2H3B/P
II2E3B/P
II2H3+
II2H3+
II2H3+
II2H3+
II2H3+
II2L3B/P
II2L3P
UNITED KINGDOM (GB) II2H3+
II2H3B/P
II2H3P
NETHERLANDS (NL)
PORTUGAL (PT)
SPAIN (ES)
SWEDEN (SE)
GREECE (GR)
ITALY (IT)
IRELAND (IE)
LUXEMBOURG (LU)
DENMARK (DK)
FRANCE (FR)
FINLAND (FI)
GERMANY (DE)
CE Approved Gas Categories by Country*
AUSTRIA (AT) II2H3B/P
BELGIUM (BE)
* H152-2 units are not approved for G30 (Butane) gas.The size of the gas line used for installation is very important. If the line is too small, the gas pres-sure at the burner manifold will be low. This may cause slow recovery and delayed ignition. Fry-master recommends the incoming gas supply line be a minimum of 1½” (38 mm) in diameter. Referto the chart on the following page for the minimum sizes of connection piping.