Frymaster none manual Heated Pass Through Installation, Operation, Service, And Parts

Models: none

1 12
Download 12 pages 24.21 Kb
Page 3
Image 3
•Voltage – 208 VAC

HEATED PASS THROUGH

INSTALLATION, OPERATION, SERVICE, AND PARTS

Power Requirements:

Voltage – 208 VAC

Frequency - 60 Hz

Single Phase

20 amp Service

4.Operation

1.Plug the unit into the power source. *

2.Press the ON/OFF rocker switch to the ON position.

3.Place product in the HPT in accordance with the restaurant’s established procedures.

THIS APPLIANCE IS EQUIPPED WITH

A GROUNDING PLUG FOR YOUR PROTECTION AGAINST SHOCK HAZARD AND MUST BE PLUGGED INTO A PROPERLY GROUNDED RECEPTACLE. DO NOT CUT OR REMOVE THE GROUNDING PRONG.FROM THIS PLUG.

Air Tower

Heated air flows from the air tower across the plate 4.OperationManual background and into the cowl.Manual background

Plate

ON/OFF

Manual background Switch

Manual background Power Cord Cowl Manual background

Air flow through the HPT

Blower

Plate

2

Page 3
Image 3
Frymaster none manual Heated Pass Through Installation, Operation, Service, And Parts