HEATED PASS THROUGH
INSTALLATION, OPERATION, SERVICE, AND PARTS
Power Requirements:
•Voltage – 208 VAC
•Frequency - 60 Hz
•Single Phase
•20 amp Service
4.Operation
1.Plug the unit into the power source. *
2.Press the ON/OFF rocker switch to the ON position.
3.Place product in the HPT in accordance with the restaurant’s established procedures.
THIS APPLIANCE IS EQUIPPED WITH
A GROUNDING PLUG FOR YOUR PROTECTION AGAINST SHOCK HAZARD AND MUST BE PLUGGED INTO A PROPERLY GROUNDED RECEPTACLE. DO NOT CUT OR REMOVE THE GROUNDING PRONG.FROM THIS PLUG.
Air Tower
Heated air flows from the air tower across the plate and into the cowl.
Plate
ON/OFF
Switch
Power Cord Cowl
Air flow through the HPT
Blower
Plate
2