Frymaster none manual Heated Pass Through Installation, Operation, Service, And Parts, General

Models: none

1 12
Download 12 pages 24.21 Kb
Page 2
Image 2
HEATED PASS THROUGH

HEATED PASS THROUGH

INSTALLATION, OPERATION, SERVICE, AND PARTS

1.Parts Ordering and Service Information

Parts orders may be placed directly with your local Frymaster Factory Authorized Service Center (FASC)/Distributor. A list of Frymaster FASC/ Distributors was included with the unit when shipped from the factory. Your nearest FASC can also be found on Frymaster’s Web site, Frymaster.com. or you can contact the Frymaster Service Department at 1-800-24-FRYER or 1-318- 865-1711.

To speed up your order, the following information is required:

Model Number _________________________

Serial Number _________________________

Voltage_______________________________

Item Part Number_______________________

Quantity Needed _______________________

Service may be obtained by contacting your local Frymaster Authorized Service Center/Distributor. Service information may be obtained by calling the Frymaster Service Department. The following information will be needed in order to assist you quickly and efficiently:

Model Number _________________________

Serial Number _________________________

Nature of theProblem_____________________________________________________________

______________________________________________________________________________

______________________________________________________________________________

Also include any other information which may be helpful in solving your service problem.

RETAIN AND STORE THIS MANUAL IN THE EQUIPMENT MANUAL FOR FUTURE USE.

2.General

The Heated Pass Through or HPT is designed to hold assembled sandwiches. By circulating heated air evenly across the open staging area, the unit keeps sandwiches hot without drying or cooking.

3.Installation/Set Up

Upon arrival, inspect the HPT for concealed damage. Immediately report any damage to the delivering freight company. Claims must be filed within 15 days after receipt of the unit.

Make sure that the unit is placed on an even surface and that the area surrounding the HPT is free of clutter that would interfere with airflow.

Install the Filter Screen

The filter screen is designed to prevent debris from entering the cowl assembly and clogging the blower. Slip the part over the vent opening on the ON/OFF switch side of the unit. The filter screen snaps into position. If it is equipped with an optional holding screw, tighten the screw to pull the filter screen snug into position.

The filter screen snaps into place on the air-intake tower.

1

Page 2
Image 2
Frymaster none Heated Pass Through Installation, Operation, Service, And Parts, Parts Ordering and Service Information