SUPER MARATHON SERIES GAS FRYERS
CHAPTER 3: INSTALLATION INSTRUCTIONS
3-13
3.7 Gas Conversion Procedures (cont.) Conversion from one gas family to another (i.e. changing from natural gas to propane) requires
special components. Obtain the necessary components using the cross-reference in Section 3.8, Gas
Conversion Components.
Conversions can only be executed by qualified, factory-authorized personnel.
ON Button-
(pilot gas flow) OFF Button
Pressure flow
adjustment
Thermocouple
connection Pilot flow
adjustment
Vent tube
connection
Vessel Assembly
Gas Valve
Manifold Support Bracket
Gas Burner
See Detail A
Pressure
Test
Spigot
Orifice
Temperature
Control
Gas
Manifold
Assembly
1/2—3/4 Reducer
Bushing
Burner
Gas Manifold
Burner/Orifice Location
Detail A
Orifice
1.30-inch [33-mm]
1.63-inch [41-mm]
CE Gas
Valve
Typical gas valve, burner and orifice locations (SM35 shown above).