2.4Power-on Sequence

Before turning on the power, ensure that all connections are complete. Then, turn on the power in the order of the host machine, the main unit, then the target (user system).

Power-on sequence

Before turning on the power, ensure that all connections are complete. Then, turn on the power in the order of the host machine, the main unit, then the target (user system).

To turn on the power, set the power switch on the rear panel of the main unit to “1.” Turning on the main unit also turns on the 10BASE-T LAN adapter.

16

Page 22
Image 22
Fujitsu MB2142-02 user manual Power-on Sequence, Power-on sequence