B1 |
|
| B2 | |
PRIMERGY Floorstand |
| PRIMERGY Rack | ||
|
|
|
|
|
|
|
|
|
|
PRIMECENTER- Rack
Installation ex works for one server or subsystem
Hereby the rack will be delivered completely
will be delivered installed in the rack With racks 46U:
Systems and components will be delivered separately
To be ordered only together with
aPRIMERGY- PRIMECENTER rack
refer configurator PC-rack max. 1x per System
System configurator and
PRIMERGY TX150 S4 | Status 25.11.2005 |
This service is to be ordered once per installable server/storage subsystem, in order to get the server/storage subsystem mounted into the PRIMERGY racks. In case of the 46 U PRIMERGY rack, this service has to be ordered,
to get the mounting kits and the cables installed.
For later conversion of TX150 base unit floorstand into base unit rack the following kit is availible
1.) Conversion TX150S4 base unit floorstand into base unit rack rack mount kit has to be ordered separately
For (later) mounting in racks the following kits are available:
1.) | PRIMERGY | |
incl. cable carrier |
| |
2.) | PRIMERGY | |
incl. DC- PC- bracket, cable managment |
| |
|
|
|
3.) | PRIMERGY mounting kit for server racks | |
conforming to EIA standards |
| |
|
|
|
C
Fujitsu Siemens Computers | 8 of 18 |