Assembling the GWS 10 |
|
| |
EN |
| ||
To assemble the GWS 10: |
| ||
1. | Ensure the shaft lines up correctly with the slot on the component. The slot on the component only fits one way on the shaft. |
|
|
2. | Press until the component is seated securely. |
|
|
|
|
wind vane
anemometer
NOTE: If the wind sensor is assembled, disassemble it for repair purposes only.
Installing the GWS 10To install the GWS 10:
1.Route the
2.Drill pilot holes and use the provided hardware to mount the GWS 10 in the appropriate orientation. If there is not a horizontal surface at the top of the mast, create a wedge to mount the unit horizontally.
Note: If you do not mount the GWS 10 facing the exact front of the boat, you must configure the software to the appropriate
Mount the GWS 10 at the top of the mast facing the front of the boat parallel with the boat center line
3.At the top of the mast, connect the
4.Secure the
5.Pull the cable at the bottom of the mast to remove the slack.
6.Run the
1.Connect the two
2.The NMEA 2000 power cable must be connected to a
3.Connect the NMEA 2000 power cable to one of the
4.Connect the NMEA 2000 drop cable to the other
5.Add additional
6.Connect the female terminator to the appropriate end of the combined
Caution: You must connect the included NMEA 2000 power cable to the ignition switch of the boat or through an external switch. The GMI 10 and GWS 10 will drain your battery if you connect them directly to the battery.
GWS 10 installation instructions |