
Installing the 5- and
Installing the 5- and 8-port switches
Package contents
Open the shipping carton and carefully unpack its contents. The carton should contain the following items:
■One Gateway
■Four rubber feet with adhesive backing
■One external power adapter
■This manual
If any item is found missing or damaged, contact Gateway for a replacement.
Attaching the rubber feet
Position and apply rubber feet to the underside of the switch.
Provide for adequate ventilation
Warning Do not place any device on top of the switch or place the switch on top of any device or object that will block the free flow of air through the ventilation slots on the sides, top, and bottom of the switch’s case. In addition, care should be taken not to locate the switch next to, on top of, or underneath any device that generates a significant amount of heat. For the switch to perform at its optimal level, the switch must have adequate ventilation to prevent the switch from overheating and becoming damaged.
Power on
Plug one end of the AC power adapter into the power connector on the switch and the other end into the local power source outlet.
www.gateway.com | 11 |